Building Facility Renewal – Kal Tire Place Condenser Replacement

Project Number
2026-03
Funded by
Growing Communities Fund, Recreation Reserve, Casino Funds, Infrastructure Reserve
Project State
Current
Scheduled Project Start
Summer 2026
Scheduled Project Completion
Summer 2026

This project is part of the City of Vernon's 2026 to 2030 Five-Year Rolling Infrastructure Plan, is identified in the Building Facility Renewal Asset Management Plan as a project in 2026 and further supported by a detailed condition assessment of the ice plant at Kal Tire Place. Through the Building Facility Renewal Asset Management Plan and condition assessment it was determined that the condenser at Kal Tire Place has reached the end of its service life and is showing signs of deterioration, including corrosion on the internal coil.

The City is planning on replacing the old condenser with a new unit. The proposed new unit has the ability to operate without water for approximately 90% of the year, which provides huge water savings each year. Additionally, the new unit will use significantly less ammonia coolant than the existing unit, drastically enhancing the safety of the ice plant.  

To minimize disruptions to user groups, the City is planning on replacing the unit during the next scheduled ice plant shutdown, planned for summer 2026. 

Project Information Sheet
 

Image
Kal Tire Place - Existing Condenser
Caption
Kal Tire Place - Existing Condenser
Company Contact

Polar Engineering
Scott Stewart, P.Eng.
Team Lead/Sr. Engineer
Office: 778-700-1086
scott@polareng.ca

 

City Contact(s)

Jackson Stewart, EIT.
Senior Project Manager
Office: 250-550-3589
jstewart@vernon.ca