The following list shows results of bid opportunities that have closed. Closed annual contracts are shown in a separate list.
Bid Results
| File No | Project Description | Awarded To | Bid Close Date |
|---|---|---|---|
| 19-69-IS | Terminal Servers |
Powerland Computers Ltd.
$69187.42 |
Jul 18, 2019 |
| 19-74-FAC | City Hall Boiler Replacement |
Sunset West Mechanical Ltd.
$176162.70 |
Jul 18, 2019 |
| 19-61-AIR | Automatic Weather Observation System |
Spencer Navigation Maintenance Ltd.
$41431.95 |
Jun 27, 2019 |
| 19-59-FLT | Mobile Column Lifts |
Alberta Sales Auto-Quip
$54795.40 |
Jun 25, 2019 |
| 19-55-VWRC | Chemical Dosing System Design |
AECOM Canada Ltd. ( includes GST)
$131250.00 |
Jun 13, 2019 |
| 19-63-IS | Laptops and PCs |
London Drugs $9,076.44 & Microserve $66,591.03
$75667.47 |
Jun 6, 2019 |
| 19-51-FAC | Tube Heater Replacements |
Sunset West Mechanical
$38935.96 |
May 28, 2019 |
| 19-23-FAC | Overhead Doors |
Ultimate Door Services Ltd.
$103319.24 |
May 27, 2019 |
| 19-50-OPS | Kin Race Track Demolition |
LRM Contracting Ltd.
$138390.00 |
May 23, 2019 |
| 19-43-REC | Event Flooring for Arena |
Hi-Pro Sporting Goods Ltd.
$126201.60 |
May 16, 2019 |
| 19-46-FLT | Double Drum Walk Behind Vibratory Compaction Roller |
Savoy Equipment Ltd.
$22427.67 |
May 10, 2019 |
| 19-36-FLT | Backhoe |
Brand Tractor Ltd.
$166519.36 |
May 9, 2019 |
| 19-11-FAC | Outdoor Bathrooms - Portland Loo(s) |
Cancelled.
|
Apr 30, 2019 |
| 19-41-FLT | Rotary Mower |
Oakcreek Golf & Turf LP
$111966.40 |
Apr 30, 2019 |
| 19-12-CID | Corporate Fleet Electric Bicycle |
Electric Fat Bike Company (1 Bike) Pedego Oyama (2 Bikes) Vernon E-Ride (3 Bikes) $17984.79 |
Apr 25, 2019 |
| 19-42-AIR | Vernon Airport Line Painting |
Aardvark Pavement Marking
$18474.75 |
Apr 23, 2019 |
| 19-02-AIR | Vernon Airport SMS Audit Services |
Tetra Tech Canada Inc.
$7350.00 |
Apr 17, 2019 |
| 19-21-FLT | TA Hooklift Crane Truck w/Dump Box |
Cancelled - Over Budget
|
Mar 28, 2019 |
| 19-28-IS | Cisco Switches |
CDW Canada
$27744.08 |
Mar 20, 2019 |
| 19-04-INF | 48th Avenue Drainage and Road Rehab |
R355 Enterprises Ltd. (GST included in price)
$1752943.82 |
Mar 14, 2019 |