The following list shows results of bid opportunities that have closed. Closed annual contracts are shown in a separate list.
Bid Results
| File No | Project Description | Awarded To | Bid Close Date |
|---|---|---|---|
| 19-18-ENG | 30th St Reconstruction -37 Ave. to 41 Ave. |
CGL Contracting Ltd. (GST included)
$4280157.00 |
Oct 31, 2019 |
| 19-95-VWRC | Online Wastewater Analyzer |
Capital H20 Systems (GST & PST included)
$90720.00 |
Oct 7, 2019 |
| 19-87-VWRC | Riprap Supply and Installation |
D Webb Contracting Ltd.
$21693.00 |
Sep 26, 2019 |
| 19-60-CID | Beachcomber Bay Lake Access Landscape Improvements |
Sierra Landscaping Ltd.
$75366.16 |
Sep 19, 2019 |
| 19-86-CID | Marshall Field Fencing |
Vernon On Site Fencing Ltd.
$44831.36 |
Sep 11, 2019 |
| 19-84-REC | Child Care Space Action Plan |
CANCELLED
|
Sep 3, 2019 |
| 19-76-HR | COR Audit Services |
Glacierview Consulting Company
$10710.00 |
Aug 29, 2019 |
| 19-85-IS | PDF Software Licensing |
Softchoice LP
$14434.51 |
Aug 29, 2019 |
| 19-82-FIR | Fire Fighting Apparatus |
Commercial Emergency Equipment Co. ( includes all PST & GST)
$2197036.92 |
Aug 2, 2019 |
| 19-75-FLT | Truck 1 Ton 4x4 |
Metro Motors Ltd
$49504.00 |
Aug 1, 2019 |
| 19-70-FLT | Truck Mid-Size 4x4 |
Bannister GM Vernon
$36055.04 |
Aug 1, 2019 |
| 19-25-TRA | Evacuation Route Planning |
CANCELLED
$0.00 |
Jul 23, 2019 |
| 19-67-INF | 15th Ave. DND Storm Rehabilitation Hwy 97 to Vernon Creek |
Pyramid Excavation Corporation
$2264077.20 |
Jul 23, 2019 |
| 19-45-REC | Active Living Centre Feasibility Study |
FaulknerBrowns Architecture Inc. ( includes GST)
$157348.80 |
Jul 19, 2019 |
| 19-68-INF | City of Vernon Flood Mapping, Risk Analysis & Mitigation |
Northwest Hydraulic Consultants Ltd. ( includes GST)
$202665.75 |
Jul 19, 2019 |
| 19-69-IS | Terminal Servers |
Powerland Computers Ltd.
$69187.42 |
Jul 18, 2019 |
| 19-74-FAC | City Hall Boiler Replacement |
Sunset West Mechanical Ltd.
$176162.70 |
Jul 18, 2019 |
| 19-61-AIR | Automatic Weather Observation System |
Spencer Navigation Maintenance Ltd.
$41431.95 |
Jun 27, 2019 |
| 19-59-FLT | Mobile Column Lifts |
Alberta Sales Auto-Quip
$54795.40 |
Jun 25, 2019 |
| 19-55-VWRC | Chemical Dosing System Design |
AECOM Canada Ltd. ( includes GST)
$131250.00 |
Jun 13, 2019 |