The following list shows results of bid opportunities that have closed. Closed annual contracts are shown in a separate list.
Bid Results
File No | Project Description | Awarded To | Bid Close Date |
---|---|---|---|
24-58-TRA | MUP Connection on 46 Ave & PV Rd |
Chapman
$836531.64 |
Aug 22, 2024 |
24-45-TOR | Video Asset Capture and Creative Production Services |
6ix Sigma Productions
$139921.11 |
Aug 20, 2024 |
24-44-TOR | Graphic Design Services - Tourism Vernon |
Interpret Design Ion Brand Designs Setsail Interactive Stephanie Tambellini Design Studio Inc. |
Aug 20, 2024 |
24-54-TRA | Urban Design Services - Renderings or Illustrations |
Barefoot Planning LTD
$40188.75 |
Jul 26, 2024 |
24-46-REC | 24-46-REC KTP Concession Upgrade - Counters |
Canadian Restaurant Services Ltd.
$30983.65 |
Jul 16, 2024 |
24-39-REC | 24-39-REC KTP Concession Upgrade - Flooring |
PFM Construction
$63042.00 |
Jul 16, 2024 |
24-47-REC | 24-47-REC KTP Concession Upgrade - Heat Pumps |
Sunset West Mechanical Ltd.
$30888.20 |
Jul 16, 2024 |
24-40-INF | Rain and Flow Monitoring Equipment |
Cancelled
$0.00 |
Jul 16, 2024 |
24-35-REC | Vernon Aquatic Centre Repurposing Study |
Innovate Planning & Co. Inc
$49921.20 |
Jul 16, 2024 |
24-34-INF | Next Generation 911 |
Urban Systems Ltd.
$31395.00 |
Jul 9, 2024 |
24-38-TRA | Environmental Mapping and State of Natural Assets |
Ecoscape Environmental Consultants Ltd.
$108723.30 |
Jul 4, 2024 |
24-37-TRA | Transportation Plan and Capital Projects Consulting Services |
McElhanney
$98523.00 |
Jul 2, 2024 |
24-29-INF | VWRC Buildings Roof Replacement |
Interior Roofing Ltd.
$590888.03 |
May 28, 2024 |
24-28-INF | MacKay Pump Station Roof Replacement |
Kelowna Roofing Ltd.
$36200.00 |
May 28, 2024 |
24-25-FLT | Tandem Axle Dump Truck |
Velocity Truck Canada
$436241.00 |
May 28, 2024 |
24-36-FLT | Electric Vehicle - VFRS |
Vernon Toyota
$53166.28 |
May 16, 2024 |
24-05-INF | Condition Assessment Stream Crossing Structures |
ISL Engineering & Land Services Ltd.
$29265.60 |
May 7, 2024 |
24-30-INF | Supply and Installation - Playground Equipment and Picnic Shelter |
Canadian Recreation Solutions Ltd.
$308647.92 |
May 7, 2024 |
24-23-VWRC | Spray Irrigation Pipe Replacement |
TwinCon Enterprises Ltd.
$47044.20 |
May 7, 2024 |
24-32-FLT | Trailer Mounted Message Board |
Valley Traffic Systems Inc.
$21840.00 |
May 2, 2024 |