. .

Traffic Safety

 

Street Signs
Street Signs
The Public Works Division is responsible for traffic signals, traffic signs and lane marking of all roads in the City of Vernon except for 32nd Street and Hwy #6 which are maintained by the Ministry of Highways.

Public Works Technicians program the timing and perform preventive maintenance of the 23 traffic signals and three pedestrian operated red controlled intersections. Currently, 27th Street from 58 Ave to 28 Ave runs on a daily time based coordination beginning at 8:00 a.m. and ending at 7:00 p.m.

A fully actuated traffic signal includes mechanisms installed at intersections that detect volume of traffic present. Based on this information, the signal provides sufficient run time to keep vehicles flowing efficiently. All signal controlled intersections include components such as a controller, traffic detector, the traffic lights and the connecting cables.

The Public Works Division staff conducts an annual inspection of all street signs as part of their preventative maintenance.

Traffic line painting is performed each spring by contractors. Additional line painting is done on an as-required basis.

If you have traffic concerns of any kind please call the Public Works Division @ 549-6757.

Back to Operations

Contact Info
 Phone:  250-549-6757
 E-mail:  operations@vernon.ca
City of Vernon British Columbia CanadaCity of Vernon
3400 30th Street
Vernon, BC V1T 5E6
Phone: 250-545-1361
Fax: 250-545-7876


Contact Us | Legal
All Rights Reserved © 2010